Tracan Electronics Corporation
Time Lines & Costs

Time lines vary vastly with the complexity of the project.  Engaging Tracan's Building Block approach and leveraging as much off the shelf product as possible, reduces the length of these time lines.  A couple of metrics we use to give some indication are listed in the table below, not all stages are required in each project.  Many custom projects complete in as little as 6 weeks.

Stage Average Time
Design Project Plan 1 Week
NRE Quotation & ROM Production Cost 3 - 5 Days
Detailed Production Cost After Design or
1 to 3 Days Engineering
Prototype 10 to 20 Days
Verification 5 Days

Costs are equally dynamic and as such would be difficult to give average guidance.  Please see our solutions examples for some representative samples for your information.